Archived edition · 02 September 2026

GMTI Capital · Global Motor Trade International

Fleet Intelligence

Open vehicle tenders and fleet market news, week ending 02 September 2026

Latest published edition · next run Monday 07 Sep, 08:00 New York

24
Open leads
0
Closing ≤7 days
11
Closing next week

East Africa

3 open leads
BAND ATanzania· Urban transit & BRT· financing· 2026-08-08

African Development Bank — $344m

The African Development Bank has an active East Africa portfolio: in July 2026 the Bank approved a loan of nearly EUR 294 million to Kenya to bolster economic reforms, inclusion and green growth, approved USD 110…

From: Tanzania launches Phase Two of Dar es Salaam Bus Rapid Transit project

ContactSidi Ould Tah

Value
$344m
Units now (est.)
32
Units 12m (est.)
49
Buyer
African Development Bank

Indicative fleet requirement

  • Light 4x4 / double-cab pickup (supervision, HSE, survey)3 now · 4 12m est.
  • Crew bus & minibus (shift transport)20 now · 31 12m est.
  • Ambulance, rescue & fire tender0 now · 1 12m est.
  • Rigid tipper / dump truck (road-legal)2 now · 3 12m est.
  • Prime mover / tractor unit (+ trailer)1 now · 1 12m est.
  • Water, fuel & chemical bowser1 now · 1 12m est.
  • Utility, workshop & service van3 now · 5 12m est.
  • Light passenger / administration fleet2 now · 3 12m est.

Other contacts

  • Samia Suluhu Hassan — President
Financier: African Development Bank (loan)Source ↗
BAND ATanzania· Urban transit & BRT· financing· 2026-08-08

African Development Bank — $183m

…lster economic reforms, inclusion and green growth, approved USD 110 million for Ethiopia's first 300 MW independent wind power project, and approved EUR 155.99 million to upgrade Uganda's Arua Airport to boost…

From: Tanzania launches Phase Two of Dar es Salaam Bus Rapid Transit project

ContactSidi Ould Tah

Value
$183m
Units now (est.)
17
Units 12m (est.)
26
Buyer
African Development Bank

Indicative fleet requirement

  • Light 4x4 / double-cab pickup (supervision, HSE, survey)1 now · 2 12m est.
  • Crew bus & minibus (shift transport)11 now · 16 12m est.
  • Ambulance, rescue & fire tender0 now · 0 12m est.
  • Rigid tipper / dump truck (road-legal)1 now · 2 12m est.
  • Prime mover / tractor unit (+ trailer)0 now · 1 12m est.
  • Water, fuel & chemical bowser0 now · 1 12m est.
  • Utility, workshop & service van2 now · 3 12m est.
  • Light passenger / administration fleet1 now · 2 12m est.

Other contacts

  • Samia Suluhu Hassan — President
Financier: African Development Bank (loan)Source ↗
BAND BKenya· Power generation & renewables· fid· 2026-07-27

Kenya Olkaria geothermal ammonia project fully financed at USD 800 million by Kaishan Group

…ners are present, including Coega's relationship with ITOCHU and European buyers, and Kenya's Olkaria geothermal ammonia project, financed in full at USD 800 million by Kaishan Group with domestic and regional offtake.

Value
$800m
Units now (est.)
27
Units 12m (est.)
53
Buyer
Kaishan Group

Indicative fleet requirement

  • Light 4x4 / double-cab pickup (supervision, HSE, survey)10 now · 20 12m est.
  • Crew bus & minibus (shift transport)2 now · 4 12m est.
  • Ambulance, rescue & fire tender1 now · 1 12m est.
  • Rigid tipper / dump truck (road-legal)3 now · 6 12m est.
  • Prime mover / tractor unit (+ trailer)5 now · 10 12m est.
  • Water, fuel & chemical bowser2 now · 3 12m est.
  • Utility, workshop & service van3 now · 6 12m est.
  • Light passenger / administration fleet2 now · 4 12m est.

West Africa

3 open leads
BAND ATanzania· Ports, terminals & logistics hubs· construction· 2026-08-09

Ghana Tema Port Phase 2 and Namibia Walvis Bay expansion near completion as African procurement pipeline widens

Ghana's Tema Port Phase 2 expansion, valued at USD 1.3 billion, reached 98% completion in 2025, lifting container capacity to 3.7 million TEUs.

Value
$1.3bn
Units now (est.)
77
Units 12m (est.)
115
Buyer
Ghana's Tema Port

Indicative fleet requirement

  • Light 4x4 / double-cab pickup (supervision, HSE, survey)19 now · 29 12m est.
  • Crew bus & minibus (shift transport)7 now · 11 12m est.
  • Ambulance, rescue & fire tender2 now · 4 12m est.
  • Rigid tipper / dump truck (road-legal)10 now · 14 12m est.
  • Prime mover / tractor unit (+ trailer)19 now · 29 12m est.
  • Water, fuel & chemical bowser5 now · 7 12m est.
  • Utility, workshop & service van7 now · 11 12m est.
  • Light passenger / administration fleet7 now · 11 12m est.
BAND AGuinea· Mining & minerals processing· financing· 2026-08-11

Port of Owendo — $365m

Separately a EUR 312 million financing agreement between Proparco, the IFC and Societe d'Exploitation du Transgabonais was signed in July 2026 to support the second phase of the

From: Abidjan-Lagos Corridor enters investment phase; Guinea approves Phase One of USD 1.8 billion Liberty Corridor

Value
$365m
Units now (est.)
25
Units 12m (est.)
38
Buyer
Port of Owendo

Indicative fleet requirement

  • Light 4x4 / double-cab pickup (supervision, HSE, survey)11 now · 16 12m est.
  • Crew bus & minibus (shift transport)2 now · 4 12m est.
  • Ambulance, rescue & fire tender1 now · 1 12m est.
  • Rigid tipper / dump truck (road-legal)4 now · 5 12m est.
  • Prime mover / tractor unit (+ trailer)2 now · 3 12m est.
  • Water, fuel & chemical bowser1 now · 2 12m est.
  • Utility, workshop & service van2 now · 3 12m est.
  • Light passenger / administration fleet2 now · 4 12m est.
Financier: Gabon Railway (corporate)Source ↗
BAND BGuinea· Mining & minerals processing· financing· 2026-08-11

African Development Bank — $1.8bn

Guinea approves Phase One of USD 1.8 billion Liberty Corridor.

From: Abidjan-Lagos Corridor enters investment phase; Guinea approves Phase One of USD 1.8 billion Liberty Corridor

Value
$1.8bn
Units now (est.)
86
Units 12m (est.)
129
Buyer
African Development Bank

Indicative fleet requirement

  • Light 4x4 / double-cab pickup (supervision, HSE, survey)37 now · 56 12m est.
  • Crew bus & minibus (shift transport)8 now · 12 12m est.
  • Ambulance, rescue & fire tender3 now · 5 12m est.
  • Rigid tipper / dump truck (road-legal)12 now · 19 12m est.
  • Prime mover / tractor unit (+ trailer)6 now · 9 12m est.
  • Water, fuel & chemical bowser4 now · 6 12m est.
  • Utility, workshop & service van6 now · 9 12m est.
  • Light passenger / administration fleet8 now · 12 12m est.

Middle East

3 open leads
BAND A· Oil & gas — offshore· awarded· 2026-08-21

ADNOC Offshore awards L&T Energy Hydrocarbon USD 1.75 billion ultra-mega EPCIC contract

ADNOC Offshore has awarded an ultra-mega Engineering, Procurement, Construction, Installation and Commissioning contract worth more than USD 1.75 billion to L&T Energy Hydrocarbon Offshore.

Value
$1.8bn
Units now (est.)
12
Units 12m (est.)
17
Buyer
L&T Energy

Indicative fleet requirement

  • Light 4x4 / double-cab pickup (supervision, HSE, survey)4 now · 6 12m est.
  • Crew bus & minibus (shift transport)2 now · 3 12m est.
  • Ambulance, rescue & fire tender0 now · 1 12m est.
  • Rigid tipper / dump truck (road-legal)0 now · 1 12m est.
  • Prime mover / tractor unit (+ trailer)1 now · 2 12m est.
  • Water, fuel & chemical bowser0 now · 1 12m est.
  • Utility, workshop & service van2 now · 3 12m est.
  • Light passenger / administration fleet2 now · 3 12m est.
BAND B· Oil & gas — offshore· awarded· 2026-08-12

Saipem awarded USD 1.8 billion offshore EPCI contract in the Middle East

Value
$1.8bn
Units now (est.)
12
Units 12m (est.)
18
Buyer
Saipem

Indicative fleet requirement

  • Light 4x4 / double-cab pickup (supervision, HSE, survey)4 now · 6 12m est.
  • Crew bus & minibus (shift transport)2 now · 3 12m est.
  • Ambulance, rescue & fire tender0 now · 1 12m est.
  • Rigid tipper / dump truck (road-legal)0 now · 1 12m est.
  • Prime mover / tractor unit (+ trailer)1 now · 2 12m est.
  • Water, fuel & chemical bowser0 now · 1 12m est.
  • Utility, workshop & service van2 now · 3 12m est.
  • Light passenger / administration fleet2 now · 3 12m est.
BAND B· Oil & gas — onshore· awarded· 2026-08-24

L&T Energy Hydrocarbon Onshore signs ultra-mega gas compression EPC contract in the Middle East

ContactE S Sathyanarayanan

Buyer
L&T Energy

South East Asia

4 open leads
BAND AVietnam· Rail & corridor construction· construction· 2026-08-18

Vietnam targets late-2026 groundbreaking on USD 67 billion North-South high-speed railway

…ivity ahead of its 3,000 km target, and has shifted ministerial focus to the 1,541 km North-South high-speed railway, a project carrying an estimated USD 67 billion with a ground-breaking target of late 2026.

Value
$67.0bn
Units now (est.)
1,534
Units 12m (est.)
2,762
Buyer
Long Thanh International

Indicative fleet requirement

  • Light 4x4 / double-cab pickup (supervision, HSE, survey)444 now · 800 12m est.
  • Crew bus & minibus (shift transport)162 now · 291 12m est.
  • Ambulance, rescue & fire tender40 now · 73 12m est.
  • Rigid tipper / dump truck (road-legal)363 now · 654 12m est.
  • Prime mover / tractor unit (+ trailer)202 now · 363 12m est.
  • Water, fuel & chemical bowser121 now · 218 12m est.
  • Utility, workshop & service van121 now · 218 12m est.
  • Light passenger / administration fleet81 now · 145 12m est.
BAND BMalaysia· Rail & corridor construction· unknown· 2026-08-14

Philippines North-South Commuter Railway — $15.4bn

Major Southeast Asian rail programmes advancing in 2026 include the Philippines North-South Commuter Railway, a 147 km line budgeted at PHP 873.62 billion, and the Metro Manila Subway at 33 km and PHP 355.6 billion.

From: Philippines North-South Commuter Railway and Malaysia East Coast Rail Link advance in 2026

Value
$15.4bn
Units now (est.)
186
Units 12m (est.)
335
Buyer
Philippines North-South Commuter Railway

Indicative fleet requirement

  • Light 4x4 / double-cab pickup (supervision, HSE, survey)54 now · 97 12m est.
  • Crew bus & minibus (shift transport)20 now · 35 12m est.
  • Ambulance, rescue & fire tender5 now · 9 12m est.
  • Rigid tipper / dump truck (road-legal)44 now · 79 12m est.
  • Prime mover / tractor unit (+ trailer)25 now · 44 12m est.
  • Water, fuel & chemical bowser15 now · 26 12m est.
  • Utility, workshop & service van15 now · 26 12m est.
  • Light passenger / administration fleet10 now · 18 12m est.
BAND BMalaysia· Rail & corridor construction· unknown· 2026-08-14

Philippines North-South Commuter Railway — $6.3bn

…in 2026 include the Philippines North-South Commuter Railway, a 147 km line budgeted at PHP 873.62 billion, and the Metro Manila Subway at 33 km and PHP 355.6 billion.

From: Philippines North-South Commuter Railway and Malaysia East Coast Rail Link advance in 2026

Value
$6.3bn
Units now (est.)
98
Units 12m (est.)
175
Buyer
Philippines North-South Commuter Railway

Indicative fleet requirement

  • Light 4x4 / double-cab pickup (supervision, HSE, survey)28 now · 51 12m est.
  • Crew bus & minibus (shift transport)10 now · 19 12m est.
  • Ambulance, rescue & fire tender3 now · 5 12m est.
  • Rigid tipper / dump truck (road-legal)23 now · 42 12m est.
  • Prime mover / tractor unit (+ trailer)13 now · 23 12m est.
  • Water, fuel & chemical bowser8 now · 14 12m est.
  • Utility, workshop & service van8 now · 14 12m est.
  • Light passenger / administration fleet5 now · 9 12m est.
BAND BMalaysia· Rail & corridor construction· unknown· 2026-08-14

Malaysia's East Coast Rail — $1.2bn

The Johor Bahru to Singapore Rapid Transit System Link is budgeted at RM 5.245 billion, with construction begun in January 2021 and passenger service targeted for the end of 2026.

From: Philippines North-South Commuter Railway and Malaysia East Coast Rail Link advance in 2026

Value
$1.2bn
Units now (est.)
30
Units 12m (est.)
55
Buyer
Malaysia's East Coast Rail

Indicative fleet requirement

  • Light 4x4 / double-cab pickup (supervision, HSE, survey)9 now · 16 12m est.
  • Crew bus & minibus (shift transport)3 now · 6 12m est.
  • Ambulance, rescue & fire tender1 now · 1 12m est.
  • Rigid tipper / dump truck (road-legal)7 now · 13 12m est.
  • Prime mover / tractor unit (+ trailer)4 now · 7 12m est.
  • Water, fuel & chemical bowser2 now · 4 12m est.
  • Utility, workshop & service van2 now · 4 12m est.
  • Light passenger / administration fleet2 now · 3 12m est.

North Africa

2 open leads
BAND BMorocco· Green hydrogen, ammonia & heavy industry· financing· 2026-08-22

OCP — $32.5bn

Morocco approves USD 32.5 billion of green hydrogen projects

From: Morocco approves USD 32.5 billion of green hydrogen projects; OCP commits USD 10 billion to 12 GW of renewables

Value
$32.5bn
Units now (est.)
187
Units 12m (est.)
437
Buyer
OCP

Indicative fleet requirement

  • Light 4x4 / double-cab pickup (supervision, HSE, survey)69 now · 160 12m est.
  • Crew bus & minibus (shift transport)19 now · 44 12m est.
  • Ambulance, rescue & fire tender6 now · 15 12m est.
  • Rigid tipper / dump truck (road-legal)19 now · 44 12m est.
  • Prime mover / tractor unit (+ trailer)25 now · 58 12m est.
  • Water, fuel & chemical bowser13 now · 29 12m est.
  • Utility, workshop & service van19 now · 44 12m est.
  • Light passenger / administration fleet19 now · 44 12m est.
BAND BMorocco· Green hydrogen, ammonia & heavy industry· financing· 2026-08-22

OCP — $10.0bn

OCP commits USD 10 billion to 12 GW of renewables.

From: Morocco approves USD 32.5 billion of green hydrogen projects; OCP commits USD 10 billion to 12 GW of renewables

Value
$10.0bn
Units now (est.)
80
Units 12m (est.)
187
Buyer
OCP

Indicative fleet requirement

  • Light 4x4 / double-cab pickup (supervision, HSE, survey)29 now · 69 12m est.
  • Crew bus & minibus (shift transport)8 now · 19 12m est.
  • Ambulance, rescue & fire tender3 now · 6 12m est.
  • Rigid tipper / dump truck (road-legal)8 now · 19 12m est.
  • Prime mover / tractor unit (+ trailer)11 now · 25 12m est.
  • Water, fuel & chemical bowser5 now · 13 12m est.
  • Utility, workshop & service van8 now · 19 12m est.
  • Light passenger / administration fleet8 now · 19 12m est.

Latin America

1 open leads
BAND CChile· Mining & minerals processing· mou· 2026-08-19

SANY Group ships first autonomous mining truck fleet to South America

Buyer
SANY Group

Eastern Europe

6 open leads
BAND AUkraine· Post-conflict & disaster reconstruction· financing· 2026-08-25

State Agency for Restoration and Development of Infrastructure of Ukraine — $526m

A sovereign loan of up to EUR 450 million has been on-lent to the State Agency for Restoration and Development of Infrastructure of Ukraine, formerly Ukravtodor, in three tranches, the first

From: EBRD commits over EUR 500 million in new Ukraine financing, total wartime support reaches EUR 10.5 billion

Value
$526m
Units now (est.)
68
Units 12m (est.)
68
Buyer
State Agency for Restoration and Development of Infrastructure of Ukraine

Indicative fleet requirement

  • Light 4x4 / double-cab pickup (supervision, HSE, survey)21 now · 21 12m est.
  • Crew bus & minibus (shift transport)4 now · 4 12m est.
  • Ambulance, rescue & fire tender4 now · 4 12m est.
  • Rigid tipper / dump truck (road-legal)16 now · 16 12m est.
  • Prime mover / tractor unit (+ trailer)7 now · 7 12m est.
  • Water, fuel & chemical bowser8 now · 8 12m est.
  • Utility, workshop & service van5 now · 5 12m est.
  • Light passenger / administration fleet4 now · 4 12m est.
BAND AUkraine· Post-conflict & disaster reconstruction· financing· 2026-08-25

Ukrnafta — $187m

Under the Ukraine FIRST facility, EBRD is providing a EUR 160 million loan to state-owned Ukrnafta to install 250 MW of dispersed gas-fired generation capacity.

From: EBRD commits over EUR 500 million in new Ukraine financing, total wartime support reaches EUR 10.5 billion

Value
$187m
Units now (est.)
25
Units 12m (est.)
25
Buyer
Ukrnafta

Indicative fleet requirement

  • Light 4x4 / double-cab pickup (supervision, HSE, survey)8 now · 8 12m est.
  • Crew bus & minibus (shift transport)1 now · 1 12m est.
  • Ambulance, rescue & fire tender1 now · 1 12m est.
  • Rigid tipper / dump truck (road-legal)6 now · 6 12m est.
  • Prime mover / tractor unit (+ trailer)2 now · 2 12m est.
  • Water, fuel & chemical bowser3 now · 3 12m est.
  • Utility, workshop & service van2 now · 2 12m est.
  • Light passenger / administration fleet1 now · 1 12m est.
BAND AUkraine· Rail & corridor construction· procurement· 2026-08-24

Ukrzaliznytsia to procure 80 electric freight locomotives under EUR 300 million EBRD facility

Value
$351m
Units now (est.)
103
Units 12m (est.)
42
Buyer
Ukrzaliznytsia

Indicative fleet requirement

  • Prime mover / tractor unit (+ trailer)80 now · 0 12m
  • Light 4x4 / double-cab pickup (supervision, HSE, survey)8 now · 14 12m est.
  • Crew bus & minibus (shift transport)3 now · 5 12m est.
  • Ambulance, rescue & fire tender1 now · 1 12m est.
  • Rigid tipper / dump truck (road-legal)6 now · 12 12m est.
  • Water, fuel & chemical bowser2 now · 4 12m est.
  • Utility, workshop & service van2 now · 4 12m est.
  • Light passenger / administration fleet1 now · 3 12m est.
BAND AUkraine· Post-conflict & disaster reconstruction· financing· 2026-08-25

Ukrenergo — $105m

The package includes a EUR 90 million loan to Ukrenergo for reconstruction of selected substations.

From: EBRD commits over EUR 500 million in new Ukraine financing, total wartime support reaches EUR 10.5 billion

Value
$105m
Units now (est.)
14
Units 12m (est.)
14
Buyer
Ukrenergo

Indicative fleet requirement

  • Light 4x4 / double-cab pickup (supervision, HSE, survey)4 now · 4 12m est.
  • Crew bus & minibus (shift transport)1 now · 1 12m est.
  • Ambulance, rescue & fire tender1 now · 1 12m est.
  • Rigid tipper / dump truck (road-legal)3 now · 3 12m est.
  • Prime mover / tractor unit (+ trailer)1 now · 1 12m est.
  • Water, fuel & chemical bowser2 now · 2 12m est.
  • Utility, workshop & service van1 now · 1 12m est.
  • Light passenger / administration fleet1 now · 1 12m est.
BAND AUkraine· Post-conflict & disaster reconstruction· financing· 2026-08-25

EBRD — $19m

An EU-backed EUR 16 million EBRD loan to the City of Cherkasy financed new low-floor trolleybuses and modernised infrastructure across three routes.

From: EBRD commits over EUR 500 million in new Ukraine financing, total wartime support reaches EUR 10.5 billion

ContactEmina Kadric · kadrice@ebrd.com

Value
$19m
Units now (est.)
2
Units 12m (est.)
2
Buyer
EBRD

Indicative fleet requirement

  • Light 4x4 / double-cab pickup (supervision, HSE, survey)1 now · 1 12m est.
  • Rigid tipper / dump truck (road-legal)1 now · 1 12m est.
  • Prime mover / tractor unit (+ trailer)0 now · 0 12m est.
  • Water, fuel & chemical bowser0 now · 0 12m est.
BAND ABulgaria· Power generation & renewables· financing· 2026-08-21

EBRD lends EUR 175 million to Public Power Corporation for 400 MW of wind and solar in Bulgaria, Greece and Romania

The European Bank for Reconstruction and Development is providing a EUR 175 million loan to Public Power Corporation to support renewable energy projects across Bulgaria, Greece and Romania.

Value
$205m
Units now (est.)
5
Units 12m (est.)
11
Buyer
European Bank for Reconstruction and Development

Indicative fleet requirement

  • Light 4x4 / double-cab pickup (supervision, HSE, survey)2 now · 4 12m est.
  • Crew bus & minibus (shift transport)0 now · 1 12m est.
  • Rigid tipper / dump truck (road-legal)1 now · 1 12m est.
  • Prime mover / tractor unit (+ trailer)1 now · 2 12m est.
  • Water, fuel & chemical bowser0 now · 1 12m est.
  • Utility, workshop & service van1 now · 1 12m est.
  • Light passenger / administration fleet0 now · 1 12m est.

Caribbean

2 open leads
BAND BGuyana· Road & highway construction· unknown· 2026-08-20

China Railway — $35m

A US$35 million, 233-metre two-lane bridge with two pedestrian walkways is being delivered by China Railway Caribbean with GuyCo.

From: Guyana build pipeline: Corentyne River Bridge, CJIA terminal and Silica City

Value
$35m
Units now (est.)
2
Units 12m (est.)
2
Buyer
China Railway

Indicative fleet requirement

  • Light 4x4 / double-cab pickup (supervision, HSE, survey)1 now · 1 12m est.
  • Rigid tipper / dump truck (road-legal)1 now · 1 12m est.
  • Prime mover / tractor unit (+ trailer)0 now · 0 12m est.
  • Water, fuel & chemical bowser0 now · 0 12m est.
BAND BGuyana· Road & highway construction· unknown· 2026-08-20

Ministry of Public Utilities and Aviation — $34m

Budget 2026 allocated GY$7 billion to start a new terminal at Cheddi Jagan International Airport, with completion expected by 2028 according to the Ministry of Public Utilities and Avi

From: Guyana build pipeline: Corentyne River Bridge, CJIA terminal and Silica City

Value
$34m
Units now (est.)
2
Units 12m (est.)
2
Buyer
Ministry of Public Utilities and Aviation

Indicative fleet requirement

  • Light 4x4 / double-cab pickup (supervision, HSE, survey)1 now · 1 12m est.
  • Rigid tipper / dump truck (road-legal)1 now · 1 12m est.
  • Prime mover / tractor unit (+ trailer)0 now · 0 12m est.
  • Water, fuel & chemical bowser0 now · 0 12m est.

Western Europe

0 open leads